N.Y.C. Admin. Code § PC 1401: Section PC 1401: General
Where this section sits in the code
- New York City Administrative Code
- Title 28
- Chapter 6: New York City Plumbing Code
1401.1 Scope.
The provisions of
Chapter 14
shall govern the materials, design, construction and installation of subsurface landscape irrigation systems connected to nonpotable water from on-site water reuse systems.
1401.2 Materials.
Above-ground drain, waste and vent piping for subsurface landscape irrigation systems shall conform to one of the standards listed in
Table 702.1
. Subsurface landscape irrigation, underground building drainage and vent pipe shall conform to one of the standards listed in
Table 702.2
.
1401.3 Tests.
Drain, waste and vent piping for subsurface landscape irrigation systems shall be tested in accordance with Section
312
.
1401.4 Inspections.
Subsurface landscape irrigation systems shall be inspected in accordance with Section
107
.
1401.5 Disinfection.
Disinfection shall not be required for on-site nonpotable water reuse for subsurface landscape irrigation systems.
1401.6 Coloring.
On-site nonpotable water reuse for subsurface landscape irrigation systems shall not be required to be dyed.
Collected 2026-09-06T02:48:57Z. Source file · JSON