N.Y.C. Admin. Code § PC 306: Section PC 306: Trenching, Excavation and Backfill
Where this section sits in the code
- New York City Administrative Code
- Title 28
- Chapter 6: New York City Plumbing Code
306.1 Support of piping.
Buried piping shall be supported throughout its entire length.
306.2 Trenching and bedding.
Where trenches are excavated such that the bottom of the trench forms the bed for the pipe, solid and continuous load-bearing support shall be provided between joints. Bell holes, hub holes and coupling holes shall be provided at points where the pipe is joined. Such pipe shall not be supported on blocks to grade. In instances where the materials manufacturer's installation instructions are more restrictive than those prescribed by the code, the material shall be installed in accordance with the more restrictive requirement.
306.2.1 Overexcavation.
Where trenches are excavated below the installation level of the pipe such that the bottom of the trench does not form the bed for the pipe, the trench shall be backfilled to the installation level of the bottom of the pipe with sand or fine gravel placed in layers not greater than 6 inches (152 mm) in depth and such backfill shall be compacted after each placement.
306.2.2 Rock removal.
Where rock is encountered in trenching, the rock shall be removed to not less than 3 inches (76 mm) below the installation level of the bottom of the pipe, and the trench shall be backfilled to the installation level of the bottom of the pipe with sand tamped in place so as to provide uniform load- bearing support for the pipe between joints. The pipe, including the joints, shall not rest on rock at any point.
306.2.3 Soft load-bearing materials.
If soft materials of poor load-bearing quality are found at the bottom of the trench, pipe shall be hung from slab above.
306.3 Backfilling.
Material used under and beside pipes shall be clean backfill, free of discarded construction material and debris. Loose earth free from rocks, broken concrete and frozen chunks shall be placed in the trench in 6-inch (152 mm) layers and tamped in place until the crown of the pipe is covered by 12 inches (305 mm) of tamped earth. The backfill under and beside the pipe shall be compacted for pipe support. Backfill shall be brought up evenly on both sides of the pipe so that the pipe remains aligned. In instances where the manufacturer's installation instructions for materials are more restrictive than those prescribed by the code, the material shall be installed in accordance with the more restrictive requirement. Backfilling is subject to progress inspection in accordance with Section
108
.
306.4 Tunneling.
Where pipe is to be installed by tunneling, jacking or a combination of both, the pipe shall be protected from damage during installation and from subsequent uneven loading. Where earth tunnels are used, adequate supporting structures shall be provided to prevent future settling or caving.