N.Y.C. Admin. Code § PC 901: Section PC 901: General
Where this section sits in the code
- New York City Administrative Code
- Title 28
- Chapter 6: New York City Plumbing Code
901.1 Scope.
The provisions of this chapter shall govern the materials, design, construction and installation of vent systems except for vent systems for methane and radon which shall be governed by this section.
901.1.1 Methane and radon venting.
The design and materials used in the installation of the methane and radon vent systems shall be approved by the commissioner and shall comply with all applicable rules of the Fire Department.
901.2 Trap seal protection.
The plumbing system shall be provided with a system of vent piping that will permit the admission or emission of air so that the seal of any fixture trap shall not be subjected to a pressure differential of more than 1 inch of water column (249 Pa).
901.2.1 Venting required.
Traps and trapped fixtures shall be vented in accordance with one of the venting methods specified in this chapter.
901.3 Chemical waste vent systems.
The vent system for a chemical waste system shall be independent of the sanitary vent system and shall terminate separately through the roof to the outdoors.
901.4 Use limitations.
The plumbing vent system shall not be utilized for purposes other than the venting of the plumbing system.
901.5 Tests.
The vent system shall be tested in accordance with Section
312
.
901.6 Engineered systems.
Engineered venting systems shall conform to the provisions of Section
919
.
Collected 2026-09-06T02:48:57Z. Source file · JSON