Ohio Rev. Code § 4926.51: Burden of proof regarding incremental cost claim.
Where this section sits in the code
- Title 49 Public Utilities
- Chapter 4926 Electric Cooperative Pole Attachments
In a complaint filed under section 4926.39 of the Revised Code, if an electric cooperative claims that the proposed rate is lower than its incremental costs, the cooperative has the burden of establishing, by a preponderance of the evidence, its incremental costs.
Collected 2026-09-14T19:24:39Z. Source file · JSON