Okla. Stat. tit. 82, § 82-105.25: Notice of completion - Inspection
Where this section sits in the code
- OK Code
- Title 82
On the date set for the completion of the work, or prior
thereto, upon notice from the owner that the work has been
completed, the Board shall cause the work to be inspected after due
notice to the owner of the permit. Such inspection shall be
thorough and complete, in order to determine the actual capacity of
the works, their safety and efficiency. If not properly and safely
constructed, the Board may require the necessary changes to be made
within a reasonable time and shall not issue a certificate of
completion until such changes are made. Failure to make such
changes within the time required by the Board shall cause the
postponement of the priority under the permit for such time as may
elapse from the date for completing such changes until made to the
satisfaction of the Board and applications subsequent in time shall
have the benefit of such postponement of priority; provided, the
Board may accept the report of inspection by a registered
professional engineer.
Collected 2026-09-14T18:32:36Z. Source file · JSON