GroundRules
← Search the law
Pennsylvania · Through 2026-04-02 (Statute Update stamp, 8 Pa.C.S.)

8 Pa.C.S. § 2462: Notice and failure to make required connection.

Read at publisher ↗
Where this section sits in the code
  1. Title 8 - BOROUGHS AND INCORPORATED TOWNS
  2. PART I BOROUGHS
  3. CHAPTER 24 WATER SYSTEM
  4. SUBCHAPTER A.7 WATER CONNECTIONS

An owner shall be given at least 45 days' notice of any ordinance requiring a water connection, and, upon failure of the owner to make the required connection, the borough may make the connection and collect the cost from the owner by a municipal claim or in an action of assumpsit. All connections required shall be uniform.

Collected 2026-09-02T16:30:38Z. Source file · JSON

Browse this collection