S.C. Code Ann. § 48-9-640: Subsequent petition if previous determination was against feasibility of district.
Where this section sits in the code
- Title 48 - ENVIRONMENTAL PROTECTION AND CONSERVATION
- CHAPTER 9 Soil and Water Conservation Districts Law
- ARTICLE 5 Creation of Soil and Water Conservation Districts
After six months shall have expired from the date of entry of a determination by the department that the operation of a proposed district is not administratively practicable and feasible and a denial of a petition pursuant to such determination, subsequent petitions may be filed as provided in Section 48-9-510 and action taken thereon in accordance with the provisions of this chapter.
Collected 2026-09-02T07:42:14Z. Source file · JSON