GroundRules
← Search the law
Utah · Through 2026 General Session

Utah Code § 19-15-101: Definitions.

Read at publisher ↗
Where this section sits in the code
  1. Title 19 Environmental Quality Code
  2. Chapter 19-15 Midstream Facility Permitting
  3. Part 19-15-1 General Provisions

As used in this chapter:

(1) "Applicant" means an individual or entity that applies for a pipeline or other permit as described in this chapter.

(2)

(a) "Midstream facility" means a facility, structure, or infrastructure used for the gathering, processing, treatment, storage, or transportation of petroleum products between the point of extraction or production and the point of distribution or end use, including:

(i) pipelines;

(ii) storage tanks;

(iii) processing plants;

(iv) compression stations;

(v) pumping stations; and

(vi) related equipment and infrastructure necessary for the operation of the facility.

(b) "Midstream facility" does not include:

(i) a gathering line, flowline, or associated surface equipment subject to the regulation of the Board of Oil, Gas, and Mining; or

(ii) an underground storage facility, including salt caverns and associated injection wells, regulated by the Board of Oil, Gas, and Mining under Title 40, Mines and Mining.

Collected 2026-09-03T11:34:33Z. Source file · JSON

Browse this collection