GroundRules
← Search the law
Utah · Through 2026 General Session

Utah Code § 54-18-302: Public workshops.

Read at publisher ↗
Where this section sits in the code
  1. Title 54 Public Utilities
  2. Chapter 54-18 Siting of High Voltage Power Line Act
  3. Part 54-18-3 Notification - Process for Obtaining Land Use Permit - Appeal

After a public utility files the notice of intent in accordance with Subsection 54-18-301(3) and before it files a land use application, the public utility shall:

(1) conduct informal public workshops at locations along the proposed corridor to provide information about:

(a) the high voltage power line; and

(b) the process for obtaining a land use permit; and

(2) provide notice of the public workshops at least 14 days before a public workshop to:

(a) a newspaper of general circulation in the target study area;

(b) radio stations in the target study area; and

(c) an affected entity.

Collected 2026-09-03T11:34:33Z. Source file · JSON

Browse this collection