Utah Code § 54-26-601: Large load customer requirements -- Cost allocation.

Read at publisher ↗
Where this section sits in the code
  1. Title 54 Public Utilities
  2. Chapter 54-26 Large-Scale Electric Service Requirements
  3. Part 54-26-6 Customer Requirements and Accounting

A large load customer shall pay all just and reasonable large load incremental costs necessary to receive electric service, including the costs of:

(1) generation resources;

(2) distribution system upgrades;

(3) to the extent permitted by federal law, and, as applicable, approved by the Federal Energy Regulatory Commission:

(a) transmission system improvements, including network upgrades; and

(b) interconnection facilities;

(4) transmission service; and

(5) other necessary infrastructure.