4VAC25-31-180: Impoundments
Where this section sits in the code
- Title 4. Conservation And Natural Resources
- Agency 25. Department of Energy
- Chapter 31. Reclamation Regulations for Mineral Mining
- Part II. Permit Standards
- Article 1. Permits
The design data and construction plans and specifications for impoundments meeting the criteria set forth in Chapter 13 ( § 45.2-1300 et seq.) of Title 45.2 of the Code of Virginia shall be submitted to the director prior to initiation of construction activities. Such a plan shall be certified as prepared by, or under the supervision of, a registered professional engineer and shall include:
1. Design and construction specifications;
2. Examination and monitoring;
3. Emergency procedures; and
4. Closure and abandonment plans.
Collected 2026-09-14T04:45:50Z. Source file · JSON