9VAC5-40-5985: Other permits
Where this section sits in the code
- Title 9. Environment
- Agency 5. State Air Pollution Control Board
- Chapter 40. Existing Stationary Sources
- Part II. Emission Standards
- Article 43.1. Emission Standards for Municipal Solid Waste Landfills for which Construction, Reconstruction, or Modification was Commenced on or before July 17, 2014 (Rule 4-43.1)
A permit may be required prior to beginning any of the activities specified below if the provisions of 9VAC5-50 (New and Modified Stationary Sources) and 9VAC5-80 (Permits for Stationary Sources) apply. Owners contemplating such action should review those provisions and contact the appropriate regional office for guidance on whether those provisions apply.
1. Construction of a facility.
2. Reconstruction (replacement of more than half) of a facility.
3. Modification (any physical change to equipment) of a facility.
4. Relocation of a facility.
5. Reactivation (re-startup) of a facility.
6. Operation of a facility.