Va. Code § 62.1-44.15:26.1: Termination of Construction General Permit coverage
Where this section sits in the code
- Title 62.1. Waters of the State, Ports and Harbors
- Chapter 3.1. State Water Control Law
- Article 2.3. Virginia Erosion and Stormwater Management Act (VESMA)
A. A VSMP authority shall recommend that the Department of Environmental Quality terminate coverage under a General Permit for Discharges of Stormwater from Construction Activities (Construction General Permit) within 60 days of receiving a complete notice of termination from the operator of the construction activity.B. Coverage under a Construction General Permit shall be deemed to be terminated 90 days after the receipt by the VSMP authority of a complete notice of termination from the operator of the construction activity.C. If a VSMP authority receives a notice of termination of a Construction General Permit that it determines to be incomplete, the VSMP authority shall, within a reasonable time, inform the operator of the construction activity of such incompleteness and provide the operator with a detailed list itemizing the elements of information that are missing from the notice.2018, c. 630.
Collected 2026-09-04T15:18:04Z. Source file · JSON