GroundRules
← Search the law
Washington · Through July 15, 2026

RCW 18.104.050: Reports of well construction or decommissioning.

Read at publisher ↗
Where this section sits in the code
  1. Title 18
  2. Chapter 18.104

(1) Any person authorized by this chapter to construct or decommission a well shall furnish a well report to the director within thirty days after the completion of the construction or decommissioning of a well. The director, by rule, shall prescribe the form of the report and the information to be contained therein.

(2) In the case of a dewatering well project:

(a) A single well construction report may be submitted for all similar dewatering wells constructed with no significant change in geologic formation; and

(b) A single well decommissioning report may be submitted for all similar dewatering wells decommissioned that have no significant change in geologic formation.

Collected 2026-09-06T01:20:08Z. Source file · JSON

Browse this collection