RCW 18.104.049: Modification of construction standards.
Where this section sits in the code
- Title 18
- Chapter 18.104
The department by rule shall adopt procedures to permit a well operator to modify construction standards to meet unforeseen circumstances encountered during the construction of a well. The procedures shall be developed in consultation with the technical advisory group established in RCW 18.104.190.
Collected 2026-09-06T01:20:08Z. Source file · JSON