RCW 4.16.325: Actions or claims arising from construction defect claims—Statute tolled.
Where this section sits in the code
- Title 4
- Chapter 4.16
If a written notice of claim is served under RCW 64.50.020 within the time prescribed for the filing of an action under this chapter, the statutes of limitations for construction-related claims are tolled until sixty days after the period of time during which the filing of an action is barred under RCW 64.50.020.
Collected 2026-09-06T00:29:21Z. Source file · JSON