GroundRules
← Search the law
Washington · Through July 15, 2026

RCW 43.21A.610: Steam electric generating plant—Study—Construction.

Read at publisher ↗
Where this section sits in the code
  1. Title 43
  2. Chapter 43.21A

The director shall continue the study of the state power commission made in 1956 relating to the construction of a steam power electric generating plant, and if the construction of a steam electric generating plant is found to be feasible by the director, the director may construct such plant at a site determined by him or her to be feasible and operate it as a state owned facility.

Collected 2026-09-06T02:47:57Z. Source file · JSON

Browse this collection