GroundRules
← Search the law
West Virginia · Through as of 2026-08-03; contains at least the enactments of the 2026 Regular Session · Newer source version available

W. Va. Code § 21-11A-9: Service on additional parties.

Read at publisher ↗
Where this section sits in the code
  1. CHAPTER 21. LABOR
  2. ARTICLE 11A. NOTICE AND OPPORTUNITY TO CURE CONSTRUCTION DEFECTS.

Within fourteen days after the initial service of the notice of claim required in subsection (a) of this section, the contractor shall forward a copy of the notice to each subcontractor, supplier and design professional who the contractor reasonably believes is responsible for a defect specified in the notice and include with the notice a description of the specific defect for which the contractor believes the subcontractor, supplier or design professional is responsible.

Collected 2026-09-06T00:25:47Z. Source file · JSON

Browse this collection