21 CFR 111.60: What are the design requirements for the production and process control system?
Where this section sits in the code
- Title 21—Food and Drugs
- CHAPTER I—FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES
- SUBCHAPTER B—FOOD FOR HUMAN CONSUMPTION
- PART 111—CURRENT GOOD MANUFACTURING PRACTICE IN MANUFACTURING, PACKAGING, LABELING, OR HOLDING OPERATIONS FOR DIETARY SUPPLEMENTS
- Subpart E—Requirement to Establish a Production and Process Control System
(a) Your production and in-process control system must be designed to ensure that the dietary supplement is manufactured, packaged, labeled, and held in a manner that will ensure the quality of the dietary supplement and that the dietary supplement is packaged and labeled as specified in the master manufacturing record; and
(b) The production and in-process control system must include all requirements of subparts E through L of this part and must be reviewed and approved by quality control personnel.
Collected 2026-08-27T02:24:47Z. Source file · JSON