30 CFR 250.238: What well or completions information must my DWOP include?
Where this section sits in the code
- Title 30—Mineral Resources
- CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR
- SUBCHAPTER B—OFFSHORE
- PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
- Subpart B—Plans and Information
You must include the following information in your DWOP, as applicable, to be consistent with the activities to be addressed in the associated well permit(s):
(a) A description and schematic of the typical wellbore, casing, and completion;
(b) Information concerning the drilling and completion systems; and
(c) Design and fabrication information for each wellbore riser system (e.g., drilling, completion, workover, intervention, injection, or production) deployed from a floating production facility or TLP.