30 CFR 250.760: What are the snubbing requirements?
Where this section sits in the code
- Title 30—Mineral Resources
- CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR
- SUBCHAPTER B—OFFSHORE
- PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
- Subpart G—Well Operations and Equipment
(a) For snubbing operations, you must follow the applicable requirements of this subpart and have the following minimum BOP-system components:
(1) One set of pipe rams hydraulically operated,
(2) Two sets of stripper-type pipe rams hydraulically operated with spacer spool,
(3) An inside BOP or a spring-loaded, back-pressure safety valve in the open position located on the rig floor, and
(4) An essentially full-opening, work-string safety valve in the open position must be maintained on the rig floor at all times and a wrench to fit the work-string safety valve must be readily available.
(5) Proper connections must be readily available for inserting valves in the work string.
(b) Test the snubbing unit in accordance with § 250.737(a), (b), and (c).