33 CFR 117.480: Mermentau River.
Where this section sits in the code
- Title 33—Navigation and Navigable Waters
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER J—BRIDGES
- PART 117—DRAWBRIDGE OPERATION REGULATIONS
- Subpart B—Specific Requirements
The draw of the S82 bridge, mile 7.1 at Grand Chenier, shall open on signal; except that, from 6 p.m. to 6 a.m. the draw shall open on signal if at least 4 hours notice is given. During the advance notice period, the draw will open on less than 4 hours notice for an emergency and will open on demand should a temporary surge in waterway traffic occur.
Collected 2026-08-27T02:25:35Z. Source file · JSON