40 CFR Table 3 to Subpart PPPPPP of Part 63: Table 3 to Subpart PPPPPP of Part 63—Applicability of General Provisions to This Subpart

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER C—AIR PROGRAMS
  4. PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES
  5. Subpart PPPPPP—National Emission Standards for Hazardous Air Pollutants for Lead Acid Battery Manufacturing Area Sources

As required in § 63.11425, you must comply with the requirements of the NESHAP General Provisions (subpart A of this part) as shown in the following table.

Citation Subject Applies to this subpart? Explanation

63.1 Applicability Yes

63.2 Definitions Yes

63.3 Units and Abbreviations

63.4 Prohibited Activities and Circumvention Yes

63.5 Preconstruction Review and Notification Requirements No

63.6(a) through (d) Compliance with Standards and Maintenance Requirements Yes

63.6(e)(1)(i) General Duty to Minimize Emissions No Section 63.11423(a)(3) specifies general duty requirements.

63.6(e)(1)(ii) Requirement to correct malfunctions as soon as possible No

63.6(e)(1)(iii) Enforceability of requirements independent of other regulations Yes

63.6(e)(3) SSM Plans No This subpart does not require a startup, shutdown, and malfunction plan.

63.6(f)(1) Compliance Except During SSM No

63.6(f)(2) and (3) Methods for determining compliance Yes

63.6(g) Use of an alternative nonopacity emission standard Yes

63.6(h)(1) SSM Exemption No

63.6(h)(2) through (9), (i) through (j) Compliance with opacity/visible emission standards, compliance extensions and exemptions Yes

63.7(a) through (d), (e)(2) and (3), (f) through (h) Performance Testing Requirements Yes

63.7(e)(1) Conditions for conducting performance tests No Requirements for performance test conditions are found in § 63.11423(c)(7).

63.8(a), (b), (c)(1)(ii), (d)(1) and (2), (e) through (g) Monitoring Requirements Yes

63.8(c)(1)(i) General duty to minimize emissions and CMS operation No Section 63.11423(a)(3) specifies general duty requirements.

63.8(c)(1)(iii) Requirement to develop SSM Plan for CMS No

63.8(d)(3) Written procedures for CMS No

63.9 Notification Requirements Yes

63.10(a), (b)(1), (b)(2)(iii), (b)(2)(vi) through (ix), (b)(3), (c)(1) through (14), (d)(1) through (4), (e), (f) Recordkeeping and Reporting Requirements Yes

63.10(b)(2)(i) Recordkeeping of occurrence and duration of startups and shutdowns No

63.10(b)(2)(ii) Recordkeeping of failures to meet a standard No Section 63.11424(a)(5) specifies these requirements.

63.10(b)(2)(iv) and (v) Actions taken to minimize emissions during SSM No

63.10(c)(15) Use of SSM Plan No

63.10(d)(5) No This subpart does not require a startup, shutdown, and malfunction plan. See § 63.11424(c) for excess emissions reporting requirements.

63.11 Control Device Requirements No This subpart does not require flares.

63.12 State Authorities and Delegations Yes

63.13 Addresses Yes

63.14 Incorporations by Reference Yes

63.15 Availability of Information and Confidentiality Yes

63.16 Performance Track Provisions Yes

63.1(a)(5), (a)(7) through (9), (b)(2), (c)(3), (d), 63.6(b)(6), (c)(3) and (4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv), 63.8(a)(3), 63.9(b)(3), (h)(4), 63.10(c)(2) through (4), (c)(9) Reserved No