43 CFR 3275.13: How must the facility operator measure the geothermal resources?
Where this section sits in the code
- Title 43—Public Lands: Interior
- Subtitle B—Regulations Relating to Public Lands
- CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR
- SUBCHAPTER C—MINERALS MANAGEMENT (3000)
- PART 3200—GEOTHERMAL RESOURCE LEASING
- Subpart 3275—Conducting Utilization Operations
The facility operator must:
(a) Measure all production, injection and utilization in accordance with methods and standards approved by BLM (see § 3275.15);
(b) Maintain and test all metering equipment. If your equipment is defective or out of tolerance, you must promptly recalibrate, repair, or replace it; and
(c) Determine the amount of production and/or utilization in accordance with methods and procedures approved by BLM (see § 3275.17).
Collected 2026-08-27T02:26:15Z. Source file · JSON