43 CFR 3276.13: What additional information must I give BLM in the monthly report for flash and dry steam facilities?
Where this section sits in the code
- Title 43—Public Lands: Interior
- Subtitle B—Regulations Relating to Public Lands
- CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR
- SUBCHAPTER C—MINERALS MANAGEMENT (3000)
- PART 3200—GEOTHERMAL RESOURCE LEASING
- Subpart 3276—Reports: Utilization Operations
In addition to the regular monthly report information required by § 3276.12, send to BLM:
(a) Steam flow into the turbine in klbs; for dual flash facilities, you must separate the steam flow into high pressure steam and low pressure steam;
(b) Condenser pressure in psia;
(c) Condenser temperature in deg. F;
(d) Auxiliary steam flow used for gas ejectors, steam seals, pumps, etc., in klbs;
(e) Flow of condensate out of the plant (after the cooling towers) in klbs; and
(f) Any other information we may require.
Collected 2026-08-27T02:26:15Z. Source file · JSON