GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

44 CFR 63.6: Reimbursable relocation costs.

Read at publisher ↗
Where this section sits in the code
  1. Title 44—Emergency Management and Assistance
  2. CHAPTER I—FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER B—INSURANCE AND HAZARD MITIGATION
  4. PART 63—IMPLEMENTATION OF SECTION 1306(c) OF THE NATIONAL FLOOD INSURANCE ACT OF 1968
  5. Subpart A—General

In addition to the coverage described in § 63.5 of this part, relocation costs for which benefits are payable under section 1306(c) of the Act include the costs of:

(a) Removing the structure from the site,

(b) Site cleanup,

(c) Debris removal,

(d) Moving the structure to a new site, and

(e) At the new site, a new foundation and related grading, including elevating the structure as required by local flood plain management ordinances, and sewer, septic, electric, gas, telephone, and water connections at the building.

Collected 2026-08-27T02:26:15Z. Source file · JSON

Browse this collection