GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

46 CFR 112.15-10: -10 Loads on systems without a temporary emergency power source.

Read at publisher ↗
Where this section sits in the code
  1. Title 46—Shipping
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER J—ELECTRICAL ENGINEERING
  4. PART 112—EMERGENCY LIGHTING AND POWER SYSTEMS
  5. Subpart 112.15—Emergency Loads

If there is no temporary emergency power source, the loads under § 112.15-1 must be arranged so that they can be energized from the final emergency power source.

Collected 2026-08-27T02:26:22Z. Source file · JSON

Browse this collection