46 CFR 154.705: Cargo boil-off as fuel: General.
Where this section sits in the code
- Title 46—Shipping
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER O—CERTAIN BULK DANGEROUS CARGOES
- PART 154—SAFETY STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES
- Subpart C—Design, Construction and Equipment
(a) Each cargo boil-off fuel system under § 154.703(c) must meet §§ 154.706 through 154.709.
(b) The piping in the cargo boil-off fuel system must have a connection for introducing inert gas and for gas freeing the piping in the machinery space.
(c) A gas fired main propulsion boiler or combustion engine must have a fuel oil fired pilot that maintains fuel flow as required under § 154.1854 if the gas fuel supply is cut-off.
Collected 2026-08-27T02:26:22Z. Source file · JSON