46 CFR 162.060-18: -18 Suspension, withdrawal, or termination of approval.
Where this section sits in the code
- Title 46—Shipping
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER Q—EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL
- PART 162—ENGINEERING EQUIPMENT
- Subpart 162.060—Ballast Water Management Systems
The Coast Guard may suspend an approval issued under this subpart or alternate management system (AMS) determination issued under 33 CFR 151.2026(d) of a ballast water management system (BWMS) in accordance with 46 CFR 2.75-40, withdraw an approval or AMS determination in accordance with 46 CFR 2.75-50(a), or terminate an approval or AMS determination in accordance with 46 CFR 2.75-50(b) if the BWMS or AMS, as manufactured—
(a) Is found non-compliant with the conditions of approval;
(b) Is unsuitable for the purpose intended by the manufacturer;
(c) Does not meet the requirements of applicable laws, rules, and regulations, and other Federal requirements when installed and operated as intended by the manufacturer; or
(d) Cannot be maintained to operate as designed, due to lack of parts or necessary support services.
Collected 2026-08-27T02:26:22Z. Source file · JSON