46 CFR 52.05-1: -1 General (modifies PW-1 through PW-54).
Where this section sits in the code
- Title 46—Shipping
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER F—MARINE ENGINEERING
- PART 52—POWER BOILERS
- Subpart 52.05—Requirements for Boilers Fabricated by Welding
Boilers and component parts, including piping, that are fabricated by welding must be as indicated in PW-1 through PW-54 of Section I of the ASME BPVC (incorporated by reference; see § 52.01-1) except as noted otherwise in this subpart.
Collected 2026-08-27T02:26:22Z. Source file · JSON