46 CFR 52.05-15: -15 Heat treatment (modifies PW-10).
Where this section sits in the code
- Title 46—Shipping
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER F—MARINE ENGINEERING
- PART 52—POWER BOILERS
- Subpart 52.05—Requirements for Boilers Fabricated by Welding
Vessels and vessel parts must be preheated and postweld heat treated in accordance with PW-38 and PW-39 of Section I of the ASME BPVC (incorporated by reference; see § 52.01-1). This includes boiler parts made of pipe material, even though they may be nondestructively examined under § 52.05-20.
Collected 2026-08-27T02:26:22Z. Source file · JSON