GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

46 CFR 64.93: Pump controls.

Read at publisher ↗
Where this section sits in the code
  1. Title 46—Shipping
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER F—MARINE ENGINEERING
  4. PART 64—MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS
  5. Subpart F—Cargo Handling System

(a) A pressure gauge must be installed—

(1) On the pump discharge;

(2) Near the pump controls; and

(3) Visible to the operator.

(b) A pump must have a remote, quick acting, manual shutdown that is conspicuously labeled and located in an easily accessible area away from the pump. The quick acting, manual shutdown for remote operation must provide a means of stopping the pump power unit.

Collected 2026-08-27T02:26:22Z. Source file · JSON

Browse this collection