GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

48 CFR 225.202: 225.202 Exceptions.

Read at publisher ↗
Where this section sits in the code
  1. Title 48—Federal Acquisition Regulations System
  2. CHAPTER 2—DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE
  3. SUBCHAPTER D—SOCIOECONOMIC PROGRAMS
  4. PART 225—FOREIGN ACQUISITION
  5. Subpart 225.2—Buy American—Construction Materials

(a)(2) A nonavailability determination is not required for construction materials listed in FAR 25.104(a). For other materials, a nonavailability determination shall be approved at the levels specified in 225.103(b)(ii). Use the estimated value of the construction materials to determine the approval level. A nonavailability determination is not required before January 1, 2030, if there is an offer for foreign construction material that exceeds 55 percent domestic content (also see FAR 25.204(b)(1)(ii) and (b)(2)(ii)).

Collected 2026-08-27T02:26:29Z. Source file · JSON

Browse this collection