- 40 CFR 60.1120 · What steps must I complete for my siting analysis?
- 40 CFR 60.1125 · What must I include in my siting analysis?
- 40 CFR 60.1130 · How do I make my siting analysis available to the public?
- 40 CFR 60.1135 · When must I accept comments on the siting analysis and revised materials separation plan?
- 40 CFR 60.1140 · Where and when must I hold a public meeting on the siting analysis?
- 40 CFR 60.1145 · What must I do with any public comments I receive during the public comment period on my siting analysis?
- 40 CFR 60.1150 · How do I submit my siting analysis?
- 40 CFR 60.1155 · What types of training must I do?
- 40 CFR 60.1160 · Who must complete the operator training course? By when?
- 40 CFR 60.1165 · Who must complete the plant-specific training course?
- 40 CFR 60.1170 · What plant-specific training must I provide?
- 40 CFR 60.1175 · What information must I include in the plant-specific operating manual?
- 40 CFR 60.1180 · Where must I keep the plant-specific operating manual?
- 40 CFR 60.1185 · What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
- 40 CFR 60.1190 · After the required date for operator certification, who may operate the municipal waste combustion unit?
- 40 CFR 60.1195 · What if all the certified operators must be temporarily offsite?
- 40 CFR 60.1200 · What are the operating practice requirements for my municipal waste combustion unit?
- 40 CFR 60.1205 · What happens to the operating requirements during periods of startup, shutdown, and malfunction?
- 40 CFR 60.1210 · What pollutants are regulated by this subpart?
- 40 CFR 60.1215 · What emission limits must I meet? By when?
- 40 CFR 60.1220 · What happens to the emission limits during periods of startup, shutdown, and malfunction?
- 40 CFR 60.1225 · What types of continuous emission monitoring must I perform?
- 40 CFR 60.1230 · What continuous emission monitoring systems must I install for gaseous pollutants?
- 40 CFR 60.1235 · How are the data from the continuous emission monitoring systems used?
- 40 CFR 60.1240 · How do I make sure my continuous emission monitoring systems are operating correctly?
- 40 CFR 60.1245 · Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission monitoring systems?
- 40 CFR 60.1250 · What is my schedule for evaluating continuous emission monitoring systems?
- 40 CFR 60.1255 · What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
- 40 CFR 60.1260 · What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is the data collection requirement enforceable?
- 40 CFR 60.1265 · How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
- 40 CFR 60.1270 · What is required for my continuous opacity monitoring system and how are the data used?
- 40 CFR 60.1275 · What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
- 40 CFR 60.1280 · What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?
- 40 CFR 60.1285 · What types of stack tests must I conduct?
- 40 CFR 60.1290 · How are the stack test data used?
- 40 CFR 60.1295 · What schedule must I follow for the stack testing?
- 40 CFR 60.1300 · What test methods must I use to stack test?
- 40 CFR 60.1305 · May I conduct stack testing less often?
- 40 CFR 60.1310 · May I deviate from the 13-month testing schedule if unforeseen circumstances arise?
- 40 CFR 60.1315 · Must I meet other requirements for continuous monitoring?
- 40 CFR 60.1320 · How do I monitor the load of my municipal waste combustion unit?
- 40 CFR 60.1325 · How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
- 40 CFR 60.1330 · How do I monitor the injection rate of activated carbon?
- 40 CFR 60.1335 · What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems and is the data collection requirement enforceable?
- 40 CFR 60.1340 · What records must I keep?
- 40 CFR 60.1345 · Where must I keep my records and for how long?
- 40 CFR 60.1350 · What records must I keep for the materials separation plan and siting analysis?
- 40 CFR 60.1355 · What records must I keep for operator training and certification?
- 40 CFR 60.1360 · What records must I keep for stack tests?
- 40 CFR 60.1365 · What records must I keep for continuously monitored pollutants or parameters?
- 40 CFR 60.1370 · What records must I keep for municipal waste combustion units that use activated carbon?
- 40 CFR 60.1375 · What reports must I submit before I submit my notice of construction?
- 40 CFR 60.1380 · What must I include in my notice of construction?
- 40 CFR 60.1385 · What reports must I submit after I submit my notice of construction and in what form?
- 40 CFR 60.1390 · What are the appropriate units of measurement for reporting my data?
- 40 CFR 60.1395 · When must I submit the initial report?
- 40 CFR 60.1400 · What must I include in my initial report?
- 40 CFR 60.1405 · When must I submit the annual report?
- 40 CFR 60.1410 · What must I include in my annual report?
- 40 CFR 60.1415 · What must I do if I am out of compliance with the requirements of this subpart?
- 40 CFR 60.1420 · If a semiannual report is required, when must I submit it?
- 40 CFR 60.1425 · What must I include in the semiannual out-of-compliance reports?
- 40 CFR 60.1430 · Can reporting dates be changed?
- 40 CFR 60.1435 · What is an air curtain incinerator?
- 40 CFR 60.1440 · What is yard waste?
- 40 CFR 60.1445 · What are the emission limits for air curtain incinerators that burn 100 percent yard waste?
- 40 CFR 60.1450 · How must I monitor opacity for air curtain incinerators that burn 100 percent yard waste?
- 40 CFR 60.1455 · What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent yard waste?
- 40 CFR 60.1460 · What equations must I use?
- 40 CFR 60.1465 · What definitions must I know?
- 40 CFR Table 1 to Subpart AAAA of Part 60 · Table 1 to Subpart AAAA of Part 60—Emission Limits for New Small Municipal Waste Combustion Units
- 40 CFR Table 2 to Subpart AAAA of Part 60 · Table 2 to Subpart AAAA of Part 60—Carbon Monoxide Emission Limits for New Small Municipal Waste Combustion Units
- 40 CFR Table 3 to Subpart AAAA of Part 60 · Table 3 to Subpart AAAA of Part 60—Requirements for Validating Continuous Emission Monitoring Systems (CEMS)
- 40 CFR Table 4 to Subpart AAAA of Part 60 · Table 4 to Subpart AAAA of Part 60—Requirements for Continuous Emission Monitoring Systems (CEMS)
- 40 CFR Table 5 to Subpart AAAA of Part 60 · Table 5 to Subpart AAAA of Part 60—Requirements for Stack Tests
- 40 CFR 60.1500 · What is the purpose of this subpart?
- 40 CFR 60.1505 · Am I affected by this subpart?
- 40 CFR 60.1510 · Is a State plan required for all States?
- 40 CFR 60.1515 · What must I include in my State plan?
- 40 CFR 60.1520 · Is there an approval process for my State plan?
- 40 CFR 60.1525 · What if my State plan is not approvable?
- 40 CFR 60.1530 · Is there an approval process for a negative declaration letter?
- 40 CFR 60.1535 · What compliance schedule must I include in my State plan?
- 40 CFR 60.1540 · Are there any State plan requirements for this subpart that supersede the requirements specified in subpart B?
- 40 CFR 60.1545 · Does this subpart directly affect municipal waste combustion unit owners and operators in my State?
- 40 CFR 60.1550 · What municipal waste combustion units must I address in my State plan?
- 40 CFR 60.1555 · Are any small municipal waste combustion units exempt from my State plan?
- 40 CFR 60.1560 · Can an affected municipal waste combustion unit reduce its capacity to less than 35 tons per day rather than comply with my State plan?
- 40 CFR 60.1565 · What subcategories of small municipal waste combustion units must I include in my State plan?
- 40 CFR 60.1570 · What is the “model rule” in this subpart?
- 40 CFR 60.1575 · How does the model rule relate to the required elements of my State plan?
- 40 CFR 60.1580 · What are the principal components of the model rule?
- 40 CFR 60.1585 · What are my requirements for meeting increments of progress and achieving final compliance?
- 40 CFR 60.1590 · When must I complete each increment of progress?
- 40 CFR 60.1595 · What must I include in the notifications of achievement of my increments of progress?
- 40 CFR 60.1600 · When must I submit the notifications of achievement of increments of progress?
- 40 CFR 60.1605 · What if I do not meet an increment of progress?
- 40 CFR 60.1610 · How do I comply with the increment of progress for submittal of a control plan?
- 40 CFR 60.1615 · How do I comply with the increment of progress for awarding contracts?
- 40 CFR 60.1620 · How do I comply with the increment of progress for initiating onsite construction?