Browse Federal regulations
Read the original sections, or search by topic.
- 40 CFR 60.4810 · What are the operator training and qualification requirements?
- 40 CFR 60.4815 · When must the operator training course be completed?
- 40 CFR 60.4820 · How do I obtain my operator qualification?
- 40 CFR 60.4825 · How do I maintain my operator qualification?
- 40 CFR 60.4830 · How do I renew my lapsed operator qualification?
- 40 CFR 60.4835 · What if all the qualified operators are temporarily not accessible?
- 40 CFR 60.4840 · What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel?
- 40 CFR 60.4845 · What emission limits and standards must I meet and by when?
- 40 CFR 60.4850 · What operating limits and requirements must I meet and by when?
- 40 CFR 60.4855 · How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, or activated carbon injection, or if I limit emissions in some other manner, to comply with the emission limits?
- 40 CFR 60.4860 · Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction?
- 40 CFR 60.4861 · How do I establish an affirmative defense for exceedance of an emission limit or standard during malfunction?
- 40 CFR 60.4865 · How and when do I demonstrate initial compliance with the emission limits and standards?
- 40 CFR 60.4870 · How do I establish my operating limits?
- 40 CFR 60.4875 · By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?
- 40 CFR 60.4880 · How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
- 40 CFR 60.4885 · How and when do I demonstrate continuous compliance with the emission limits and standards?
- 40 CFR 60.4890 · How do I demonstrate continuous compliance with my operating limits?
- 40 CFR 60.4895 · By what date must I conduct annual air pollution control device inspections and make any necessary repairs?
- 40 CFR 60.4900 · What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
- 40 CFR 60.4905 · What are the monitoring and calibration requirements for compliance with my operating limits?
- 40 CFR 60.4910 · What records must I keep?
- 40 CFR 60.4915 · What reports must I submit?
- 40 CFR 60.4920 · Am I required to apply for and obtain a title V operating permit for my unit?
- 40 CFR 60.4925 · When must I submit a title V permit application for my new SSI unit?
- 40 CFR 60.4930 · What definitions must I know?
- 40 CFR Table 1 to Subpart LLLL of Part 60 · Table 1 to Subpart LLLL of Part 60—Emission Limits and Standards for New Fluidized Bed Sewage Sludge Incineration Units
- 40 CFR Table 2 to Subpart LLLL of Part 60 · Table 2 to Subpart LLLL of Part 60—Emission Limits and Standards for New Multiple Hearth Sewage Sludge Incineration Units
- 40 CFR Table 3 to Subpart LLLL of Part 60 · Table 3 to Subpart LLLL of Part 60—Operating Parameters for New Sewage Sludge Incineration Units a
- 40 CFR Table 4 to Subpart LLLL of Part 60 · Table 4 to Subpart LLLL of Part 60—Toxic Equivalency Factors
- 40 CFR Table 5 to Subpart LLLL of Part 60 · Table 5 to Subpart LLLL of Part 60—Summary of Reporting Requirements for New Sewage Sludge Incineration Units a
- 40 CFR 60.5000 · What is the purpose of this subpart?
- 40 CFR 60.5005 · Am I affected by this subpart?
- 40 CFR 60.5010 · Is a state plan required for all states?
- 40 CFR 60.5015 · What must I include in my state plan?
- 40 CFR 60.5020 · Is there an approval process for my state plan?
- 40 CFR 60.5025 · What if my state plan is not approvable?
- 40 CFR 60.5030 · Is there an approval process for a negative declaration letter?
- 40 CFR 60.5035 · What compliance schedule must I include in my state plan?
- 40 CFR 60.5040 · Are there any state plan requirements for this subpart that apply instead of the requirements specified in subpart B?
- 40 CFR 60.5045 · In lieu of a state plan submittal, are there other acceptable option(s) for a state to meet its section 111(d)/129 (b)(2) obligations?
- 40 CFR 60.5050 · What authorities will not be delegated to state, local, or tribal agencies?
- 40 CFR 60.5055 · Does this subpart directly affect SSI unit owners and operators in my state?
- 40 CFR 60.5060 · What SSI units must I address in my state plan?
- 40 CFR 60.5065 · What SSI units are exempt from my state plan?
- 40 CFR 60.5070 · What is the “model rule” in this subpart?
- 40 CFR 60.5075 · How does the model rule relate to the required elements of my state plan?
- 40 CFR 60.5080 · What are the principal components of the model rule?
- 40 CFR 60.5085 · What are my requirements for meeting increments of progress and achieving final compliance?
- 40 CFR 60.5090 · When must I complete each increment of progress?
- 40 CFR 60.5095 · What must I include in the notifications of achievement of increments of progress?
- 40 CFR 60.5100 · When must I submit the notifications of achievement of increments of progress?
- 40 CFR 60.5105 · What if I do not meet an increment of progress?
- 40 CFR 60.5110 · How do I comply with the increment of progress for submittal of a control plan?
- 40 CFR 60.5115 · How do I comply with the increment of progress for achieving final compliance?
- 40 CFR 60.5120 · What must I do if I close my SSI unit and then restart it?
- 40 CFR 60.5125 · What must I do if I plan to permanently close my SSI unit and not restart it?
- 40 CFR 60.5130 · What are the operator training and qualification requirements?
- 40 CFR 60.5135 · When must the operator training course be completed?
- 40 CFR 60.5140 · How do I obtain my operator qualification?
- 40 CFR 60.5145 · How do I maintain my operator qualification?
- 40 CFR 60.5150 · How do I renew my lapsed operator qualification?
- 40 CFR 60.5155 · What if all the qualified operators are temporarily not accessible?
- 40 CFR 60.5160 · What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel?
- 40 CFR 60.5165 · What emission limits and standards must I meet and by when?
- 40 CFR 60.5170 · What operating limits and requirements must I meet and by when?
- 40 CFR 60.5175 · How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, activated carbon injection, or afterburner, or if I limit emissions in some other manner, to comply with the emission limits?
- 40 CFR 60.5180 · Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction?
- 40 CFR 60.5181 · How do I establish an affirmative defense for exceedance of an emission limit or standard during malfunction?
- 40 CFR 60.5185 · How and when do I demonstrate initial compliance with the emission limits and standards?
- 40 CFR 60.5190 · How do I establish my operating limits?
- 40 CFR 60.5195 · By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?
- 40 CFR 60.5200 · How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
- 40 CFR 60.5205 · How and when do I demonstrate continuous compliance with the emission limits and standards?
- 40 CFR 60.5210 · How do I demonstrate continuous compliance with my operating limits?
- 40 CFR 60.5215 · By what date must I conduct annual air pollution control device inspections and make any necessary repairs?
- 40 CFR 60.5220 · What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
- 40 CFR 60.5225 · What are the monitoring and calibration requirements for compliance with my operating limits?
- 40 CFR 60.5230 · What records must I keep?
- 40 CFR 60.5235 · What reports must I submit?
- 40 CFR 60.5240 · Am I required to apply for and obtain a Title V operating permit for my existing SSI unit?
- 40 CFR 60.5245 · When must I submit a title V permit application for my existing SSI unit?
- 40 CFR 60.5250 · What definitions must I know?
- 40 CFR Table 1 to Subpart MMMM of Part 60 · Table 1 to Subpart MMMM of Part 60—Model Rule—Increments of Progress and Compliance Schedules for Existing Sewage Sludge Incineration Units
- 40 CFR Table 2 to Subpart MMMM of Part 60 · Table 2 to Subpart MMMM of Part 60—Model Rule—Emission Limits and Standards for Existing Fluidized Bed Sewage Sludge Incineration Units
- 40 CFR Table 3 to Subpart MMMM of Part 60 · Table 3 to Subpart MMMM of Part 60—Model Rule—Emission Limits and Standards for Existing Multiple Hearth Sewage Sludge Incineration Units
- 40 CFR Table 4 to Subpart MMMM of Part 60 · Table 4 to Subpart MMMM of Part 60—Model Rule—Operating Parameters for Existing Sewage Sludge Incineration Units a
- 40 CFR Table 5 to Subpart MMMM of Part 60 · Table 5 to Subpart MMMM of Part 60—Model Rule—Toxic Equivalency Factors
- 40 CFR Table 6 to Subpart MMMM of Part 60 · Table 6 to Subpart MMMM of Part 60—Model Rule—Summary of Reporting Requirements for Existing Sewage Sludge Incineration Units a
- 40 CFR 60.5360 · What is the purpose of this subpart?
- 40 CFR 60.5365 · Am I subject to this subpart?
- 40 CFR 60.5370 · When must I comply with this subpart?
- 40 CFR 60.5371 · What standards apply to super-emitter events?
- 40 CFR 60.5375 · What standards apply to gas well affected facilities?
- 40 CFR 60.5380 · What standards apply to centrifugal compressor affected facilities?
- 40 CFR 60.5385 · What standards apply to reciprocating compressor affected facilities?
- 40 CFR 60.5390 · What standards apply to pneumatic controller affected facilities?
- 40 CFR 60.5395 · What standards apply to storage vessel affected facilities?
- 40 CFR 60.5400 · What equipment leak standards apply to affected facilities at an onshore natural gas processing plant?
- 40 CFR 60.5401 · What are the exceptions to the equipment leak standards for affected facilities at onshore natural gas processing plants?