Browse Federal regulations
Read the original sections, or search by topic.
- 40 CFR Table 2 to Subpart OOOOb of Part 60 · Table 2 to Subpart OOOOb of Part 60—Alternative Technology Periodic Screening Frequency at Well Sites and Centralized Production Facilities Subject to AVO Inspections and/or Semiannual OGI or EPA Method 21 Monitoring
- 40 CFR Table 3 to Subpart OOOOb of Part 60 · Table 3 to Subpart OOOOb of Part 60—Required Minimum Initial SO2 Emission Reduction Efficiency (Zi)
- 40 CFR Table 4 to Subpart OOOOb of Part 60 · Table 4 to Subpart OOOOb of Part 60—Required Minimum SO2 Emission Reduction Efficiency (Zc)
- 40 CFR Table 5 to Subpart OOOOb of Part 60 · Table 5 to Subpart OOOOb of Part 60—Applicability of General Provisions to Subpart OOOOb
- 40 CFR 60.5360c · c What is the purpose of this subpart?
- 40 CFR 60.5361c · c Which pollutants are regulated by this subpart?
- 40 CFR 60.5362c · c Am I affected by this subpart?
- 40 CFR 60.5363c · c What must I include in my state or Tribal plan?
- 40 CFR 60.5364c · c How do I apply to use my state standards as part of my state or Tribal plan submission?
- 40 CFR 60.5365c · c How do I apply for a less stringent standard taking into consideration the remaining useful life of a designated facility and other factors?
- 40 CFR 60.5366c · c [Reserved]
- 40 CFR 60.5367c · c Is there an approval process for my state or Tribal plan?
- 40 CFR 60.5368c · c What if my state or Tribal plan is not approvable?
- 40 CFR 60.5369c · c Is there an approval process for a negative declaration letter?
- 40 CFR 60.5370c · c What compliance schedule must I include in my state or Tribal plan?
- 40 CFR 60.5371c · c What requirements apply to revisions to my state or Tribal plan?
- 40 CFR 60.5372c · c In lieu of a state or Tribal plan submittal, are there other acceptable option(s) for a state to meet its Clean Air Act section 111(d) obligations?
- 40 CFR 60.5373c · c What authorities will not be delegated to state, local, or Tribal agencies?
- 40 CFR 60.5374c · c Does this subpart directly affect designated facility owners and operators in my state?
- 40 CFR 60.5375c · c What designated facilities must I address in my state or Tribal plan?
- 40 CFR 60.5376c · c What is the “model rule” in this subpart?
- 40 CFR 60.5377c · c How does the model rule relate to the required elements of my state or Tribal plan?
- 40 CFR 60.5378c · c What are the principal components of the model rule?
- 40 CFR 60.5379c · c What are my requirements for meeting increments of progress and achieving final compliance?
- 40 CFR 60.5380c · c What if I do not meet the final control plan increment of progress compliance date?
- 40 CFR 60.5381c · c How do I comply with the increment of progress for submittal of a final compliance control plan?
- 40 CFR 60.5385c · c What is the purpose of this subpart?
- 40 CFR 60.5386c · c Am I subject to this subpart?
- 40 CFR 60.5387c · c When must I comply with this subpart?
- 40 CFR 60.5388c · c What standards apply to super-emitter events?
- 40 CFR 60.5390c · c What GHG standards apply to gas well liquids unloading operations at well designated facilities?
- 40 CFR 60.5391c · c What GHG standards apply to associated gas wells at well designated facilities?
- 40 CFR 60.5392c · c What GHG standards apply to centrifugal compressor designated facilities?
- 40 CFR 60.5393c · c What GHG standards apply to reciprocating compressor designated facilities?
- 40 CFR 60.5394c · c What GHG standards apply to process controller designated facilities?
- 40 CFR 60.5395c · c What GHG standards apply to pump designated facilities?
- 40 CFR 60.5396c · c What GHG standards apply to storage vessel designated facilities?
- 40 CFR 60.5397c · c What GHG standards apply to fugitive emissions components designated facilities?
- 40 CFR 60.5398c · c What alternative GHG standards apply to fugitive emissions components designated facilities and what inspection and monitoring requirements apply to covers and closed vent systems when using an alternative technology?
- 40 CFR 60.5400c · c What GHG standards apply to process unit equipment designated facilities?
- 40 CFR 60.5401c · c What are the alternative GHG standards for process unit equipment designated facilities?
- 40 CFR 60.5402c · c What are the exceptions to the GHG standards for process unit equipment designated facilities?
- 40 CFR 60.5405c · c What test methods and procedures must I use for my centrifugal compressor and reciprocating compressor designated facilities?
- 40 CFR 60.5406c · c What test methods and procedures must I use for my process unit equipment designated facilities?
- 40 CFR 60.5410c · c How do I demonstrate initial compliance with the standards for each of my designated facilities?
- 40 CFR 60.5411c · c What additional requirements must I meet to determine initial compliance for my covers and closed vent systems?
- 40 CFR 60.5412c · c What additional requirements must I meet for determining initial compliance of my control devices?
- 40 CFR 60.5413c · c What are the performance testing procedures for control devices?
- 40 CFR 60.5415c · c How do I demonstrate continuous compliance with the standards for each of my designated facilities?
- 40 CFR 60.5416c · c What are the initial and continuous cover and closed vent system inspection and monitoring requirements?
- 40 CFR 60.5417c · c What are the continuous monitoring requirements for my control devices?
- 40 CFR 60.5420c · c What are my notification, reporting, and recordkeeping requirements?
- 40 CFR 60.5421c · c What are my additional recordkeeping requirements for process unit equipment designated facilities?
- 40 CFR 60.5422c · c What are my additional reporting requirements for process unit equipment designated facilities?
- 40 CFR 60.5424c · c What are my additional recordkeeping and reporting requirements if I comply with the alternative GHG standards for fugitive emissions components designated facilities and covers and closed vent systems?
- 40 CFR 60.5425c · c What parts of the General Provisions apply to me?
- 40 CFR 60.5430c · c What definitions apply to this subpart?
- 40 CFR 60.5431c-60.5439c · §§ 60.5431c-60.5439c [Reserved]
- 40 CFR Table 1 to Subpart OOOOc of Part 60 · Table 1 to Subpart OOOOc of Part 60—Designated Facility Presumptive Standards and Regulated Entity Compliance Dates
- 40 CFR Table 2 to Subpart OOOOc of Part 60 · Table 2 to Subpart OOOOc of Part 60—Alternative Technology Periodic Screening Frequency at Well Sites, Centralized Production Facilities, and Compressor Stations Subject to AVO Inspections With Quarterly OGI or EPA Method 21 Monitoring
- 40 CFR Table 3 to Subpart OOOOc of Part 60 · Table 3 to Subpart OOOOc of Part 60—Alternative Technology Periodic Screening Frequency at Well Sites and Centralized Production Facilities Subject to AVO Inspections and/or Semiannual OGI or EPA Method 21 Monitoring
- 40 CFR Table 4 to Subpart OOOOc of Part 60 · Table 4 to Subpart OOOOc of Part 60—Applicability of General Provisions to Subpart OOOOc
- 40 CFR 60.5472 · Am I subject to this subpart?
- 40 CFR 60.5473 · What definitions must I know?
- 40 CFR 60.5474 · What standards and requirements must I meet and by when?
- 40 CFR 60.5475 · What compliance and certification requirements must I meet and by when?
- 40 CFR 60.5476 · What test methods and procedures must I use to determine compliance with the standards and requirements for certification?
- 40 CFR 60.5477 · What procedures must I use for EPA approval of a test laboratory or EPA approval of a third-party certifier?
- 40 CFR 60.5478 · What requirements must I meet for permanent labels, temporary labels (hangtags), and owner's manuals?
- 40 CFR 60.5479 · What records must I keep and what reports must I submit?
- 40 CFR 60.5480 · What activities are prohibited under this subpart?
- 40 CFR 60.5481 · What hearing and appeal procedures apply to me?
- 40 CFR 60.5482 · Who implements and enforces this subpart?
- 40 CFR 60.5483 · What parts of the General Provisions do not apply to me?
- 40 CFR 60.5508 · What is the purpose of this subpart?
- 40 CFR 60.5509 · What are my general requirements for complying with this subpart?
- 40 CFR 60.5515 · Which pollutants are regulated by this subpart?
- 40 CFR 60.5520 · What CO2 emissions standard must I meet?
- 40 CFR 60.5525 · What are my general requirements for complying with this subpart?
- 40 CFR 60.5535 · How do I monitor and collect data to demonstrate compliance?
- 40 CFR 60.5540 · How do I demonstrate compliance with my CO2 emissions standard and determine excess emissions?
- 40 CFR 60.5550 · What notifications must I submit and when?
- 40 CFR 60.5555 · What reports must I submit and when?
- 40 CFR 60.5560 · What records must I maintain?
- 40 CFR 60.5565 · In what form and how long must I keep my records?
- 40 CFR 60.5570 · What parts of the general provisions apply to my affected EGU?
- 40 CFR 60.5575 · Who implements and enforces this subpart?
- 40 CFR 60.5580 · What definitions apply to this subpart?
- 40 CFR Table 1 to Subpart TTTT of Part 60 · Table 1 to Subpart TTTT of Part 60—CO2 Emission Standards for Affected Steam Generating Units and Integrated Gasification Combined Cycle Facilities That Commenced Construction After January 8, 2014, and Reconstruction or Modification After June 18, 2014
- 40 CFR Table 2 to Subpart TTTT of Part 60 · Table 2 to Subpart TTTT of Part 60—CO2 Emission Standards for Affected Stationary Combustion Turbines That Commenced Construction After January 8, 2014, and Reconstruction After June 18, 2014 (Net Energy Output-Based Standards Applicable as Approved by the Administrator)
- 40 CFR Table 3 to Subpart TTTT of Part 60 · Table 3 to Subpart TTTT of Part 60—Applicability of Subpart A of Part 60 (General Provisions) to Subpart TTTT
- 40 CFR 60.5508a · a What is the purpose of this subpart?
- 40 CFR 60.5509a · a Am I subject to this subpart?
- 40 CFR 60.5515a · a Which pollutants are regulated by this subpart?
- 40 CFR 60.5520a · a What CO2 emissions standard must I meet?
- 40 CFR 60.5525a · a What are my general requirements for complying with this subpart?
- 40 CFR 60.5535a · a How do I monitor and collect data to demonstrate compliance?
- 40 CFR 60.5540a · a How do I demonstrate compliance with my CO2 emissions standard and determine excess emissions?
- 40 CFR 60.5550a · a What notifications must I submit and when?
- 40 CFR 60.5555a · a What reports must I submit and when?