Browse Federal regulations
Read the original sections, or search by topic.
- 40 CFR 65.82 · Design requirements.
- 40 CFR 65.83 · Performance requirements.
- 40 CFR 65.84 · Operating requirements.
- 40 CFR 65.85 · Procedures.
- 40 CFR 65.86 · Monitoring.
- 40 CFR 65.87 · Recordkeeping provisions.
- 40 CFR 65.88-65.99 · §§ 65.88-65.99 [Reserved]
- 40 CFR 65.100 · Applicability.
- 40 CFR 65.101 · Definitions.
- 40 CFR 65.102 · Alternative means of emission limitation.
- 40 CFR 65.103 · Equipment identification.
- 40 CFR 65.104 · Instrument and sensory monitoring for leaks.
- 40 CFR 65.105 · Leak repair.
- 40 CFR 65.106 · Standards: Valves in gas/vapor service and in light liquid service.
- 40 CFR 65.107 · Standards: Pumps in light liquid service.
- 40 CFR 65.108 · Standards: Connectors in gas/vapor service and in light liquid service.
- 40 CFR 65.109 · Standards: Agitators in gas/vapor service and in light liquid service.
- 40 CFR 65.110 · Standards: Pumps, valves, connectors, and agitators in heavy liquid service; pressure relief devices in liquid service; and instrumentation systems.
- 40 CFR 65.111 · Standards: Pressure relief devices in gas/vapor service.
- 40 CFR 65.112 · Standards: Compressors.
- 40 CFR 65.113 · Standards: Sampling connection systems.
- 40 CFR 65.114 · Standards: Open-ended valves or lines.
- 40 CFR 65.115 · Standards: Closed vent systems and control devices; or emissions routed to a fuel gas system or process.
- 40 CFR 65.116 · Quality improvement program for pumps.
- 40 CFR 65.117 · Alternative means of emission limitation: Batch processes.
- 40 CFR 65.118 · Alternative means of emission limitation: Enclosed-vented process units.
- 40 CFR 65.119 · Recordkeeping provisions.
- 40 CFR 65.120 · Reporting provisions.
- 40 CFR 65.121-65.139 · §§ 65.121-65.139 [Reserved]
- 40 CFR Table 1 to Subpart F of Part 65 · Table 1 to Subpart F of Part 65—Batch Processes Monitoring Frequency for Equipment Other Than Connectors
- 40 CFR 65.140 · Applicability.
- 40 CFR 65.141 · Definitions.
- 40 CFR 65.142 · Standards.
- 40 CFR 65.143 · Closed vent systems.
- 40 CFR 65.144 · Fuel gas systems and processes to which storage vessel, transfer rack, or equipment leak regulated material emissions are routed.
- 40 CFR 65.145 · Nonflare control devices used to control emissions from storage vessels or low-throughput transfer racks.
- 40 CFR 65.146 · Nonflare control devices used for equipment leaks only.
- 40 CFR 65.147 · Flares.
- 40 CFR 65.148 · Incinerators.
- 40 CFR 65.149 · Boilers and process heaters.
- 40 CFR 65.150 · Absorbers used as control devices.
- 40 CFR 65.151 · Condensers used as control devices.
- 40 CFR 65.152 · Carbon adsorbers used as control devices.
- 40 CFR 65.153 · Absorbers, condensers, carbon adsorbers, and other recovery devices used as final recovery devices.
- 40 CFR 65.154 · Halogen scrubbers and other halogen reduction devices.
- 40 CFR 65.155 · Other control devices.
- 40 CFR 65.156 · General monitoring requirements for control and recovery devices.
- 40 CFR 65.157 · Performance test and flare compliance determination requirements.
- 40 CFR 65.158 · Performance test procedures for control devices.
- 40 CFR 65.159 · Flare compliance determination and monitoring records.
- 40 CFR 65.160 · Performance test and TRE index value determination records.
- 40 CFR 65.161 · Continuous records and monitoring system data handling.
- 40 CFR 65.162 · Nonflare control and recovery device monitoring records.
- 40 CFR 65.163 · Other records.
- 40 CFR 65.164 · Performance test and flare compliance determination notifications and reports.
- 40 CFR 65.165 · Initial Compliance Status Reports.
- 40 CFR 65.166 · Periodic reports.
- 40 CFR 65.167 · Other reports.
- 40 CFR 65.168-65.169 · §§ 65.168-65.169 [Reserved]
- 40 CFR 66.1 · Applicability and effective date.
- 40 CFR 66.2 · Program description.
- 40 CFR 66.3 · Definitions.
- 40 CFR 66.4 · Limitation on review of regulations.
- 40 CFR 66.5 · Savings clause.
- 40 CFR 66.6 · Effect of litigation; time limits.
- 40 CFR 66.11 · Issuance of notices of noncompliance.
- 40 CFR 66.12 · Content of notices of noncompliance.
- 40 CFR 66.13 · Duties of source owner or operator upon receipt of a notice of noncompliance.
- 40 CFR 66.21 · How to calculate the penalty.
- 40 CFR 66.22 · Contracting out penalty calculation.
- 40 CFR 66.23 · Interim recalculation of penalty.
- 40 CFR 66.31 · Exemptions based on an order, extension or suspension.
- 40 CFR 66.32 · De Minimis exemptions.
- 40 CFR 66.33 · De Minimis exemptions: malfunctions.
- 40 CFR 66.34 · Termination of exemptions.
- 40 CFR 66.35 · Revocation of exemptions.
- 40 CFR 66.41 · Decision on petitions.
- 40 CFR 66.42 · Procedure for hearings.
- 40 CFR 66.43 · Final decision; submission of penalty calculation.
- 40 CFR 66.51 · Action upon receipt of penalty calculation.
- 40 CFR 66.52 · Petitions for reconsideration of calculation.
- 40 CFR 66.53 · Decisions on petitions.
- 40 CFR 66.54 · Procedures for hearing.
- 40 CFR 66.61 · Duty to pay.
- 40 CFR 66.62 · Method of payment.
- 40 CFR 66.63 · Nonpayment penalty.
- 40 CFR 66.71 · Determination of compliance.
- 40 CFR 66.72 · Additional payment or reimbursement.
- 40 CFR 66.73 · Petition for reconsideration and procedure for hearing.
- 40 CFR 66.74 · Payment or reimbursement.
- 40 CFR 66.81 · Final action.
- 40 CFR 66.91 · Applicability of supplemental rules.
- 40 CFR 66.92 · Commencement of hearings.
- 40 CFR 66.93 · Time limits.
- 40 CFR 66.94 · Presentation of evidence.
- 40 CFR 66.95 · Decisions of the Presiding Officer; Appeal to the Administrator.
- 40 CFR Appendix A to Part 66 · Appendix A to Part 66—Technical Support Document
- 40 CFR Appendix B to Part 66 · Appendix B to Part 66—Instruction Manual
- 40 CFR Appendix C to Part 66 · Appendix C to Part 66—Computer Program
- 40 CFR 67.1 · Purpose and scope.