Browse Virginia regulations
Read the original sections, or search by topic.
- 4VAC25-130-778.1 · Scope and purpose
- 4VAC25-130-778.13 · Identification of interests
- 4VAC25-130-778.14 · Violation information
- 4VAC25-130-778.15 · Right-of-entry information
- 4VAC25-130-778.16 · Status of unsuitability claims
- 4VAC25-130-778.17 · Permit term
- 4VAC25-130-778.18 · Insurance
- 4VAC25-130-778.21 · Proof of publication
- 4VAC25-130-778.22 · Facilities or structures used in common
- 4VAC25-130-779.4 · Responsibilities
- 4VAC25-130-779.11 · General requirements
- 4VAC25-130-779.12 · General environmental resources information
- 4VAC25-130-779.18 · Climatological information
- 4VAC25-130-779.19 · Vegetation information
- 4VAC25-130-779.21 · Soil resources information
- 4VAC25-130-779.24 · Maps; general requirements
- 4VAC25-130-779.25 · Cross sections, maps and plans
- 4VAC25-130-780.4 · Responsibilities
- 4VAC25-130-780.11 · Operation plan; general requirements
- 4VAC25-130-780.12 · Operation plan; existing structures
- 4VAC25-130-780.13 · Operation plan; blasting
- 4VAC25-130-780.14 · Operation plan; maps and plans
- 4VAC25-130-780.16 · Fish and wildlife information
- 4VAC25-130-780.18 · Reclamation plan; general requirements
- 4VAC25-130-780.21 · Hydrologic information
- 4VAC25-130-780.22 · Geologic information
- 4VAC25-130-780.23 · Reclamation plan; land use information
- 4VAC25-130-780.25 · Reclamation plan; siltation structures, impoundments, banks, dams, and embankments
- 4VAC25-130-780.27 · Reclamation plan; surface mining near underground mining
- 4VAC25-130-780.29 · Diversions
- 4VAC25-130-780.31 · Protection of public parks and historic places
- 4VAC25-130-780.33 · Relocation or use of public roads
- 4VAC25-130-780.35 · Disposal of excess spoil
- 4VAC25-130-780.37 · Road systems
- 4VAC25-130-780.38 · Support facilities
- 4VAC25-130-783.4 · Responsibilities
- 4VAC25-130-783.11 · General requirements
- 4VAC25-130-783.12 · General environmental resources information
- 4VAC25-130-783.18 · Climatological information
- 4VAC25-130-783.19 · Vegetation information
- 4VAC25-130-783.21 · Soil resources information
- 4VAC25-130-783.22 · Land-use information
- 4VAC25-130-783.24 · Maps; general requirements
- 4VAC25-130-783.25 · Cross sections, maps and plans
- 4VAC25-130-784.4 · Responsibilities
- 4VAC25-130-784.11 · Operation plan; general requirements
- 4VAC25-130-784.12 · Operation plan; existing structures
- 4VAC25-130-784.13 · Reclamation plan; general requirements
- 4VAC25-130-784.14 · Hydrologic information
- 4VAC25-130-784.15 · Reclamation plan; land use information
- 4VAC25-130-784.16 · Reclamation plan; siltation structures, impoundments, banks, dams, and embankments
- 4VAC25-130-784.17 · Protection of public parks and historic places
- 4VAC25-130-784.18 · Relocation or use of public roads
- 4VAC25-130-784.19 · Underground development waste
- 4VAC25-130-784.20 · Subsidence control plan
- 4VAC25-130-784.21 · Fish and wildlife information
- 4VAC25-130-784.22 · Geologic information
- 4VAC25-130-784.23 · Operation plan; maps and plans
- 4VAC25-130-784.24 · Road systems
- 4VAC25-130-784.25 · Return of coal processing waste to abandoned underground workings
- 4VAC25-130-784.29 · Diversions
- 4VAC25-130-784.30 · Support facilities
- 4VAC25-130-785.1 · Scope
- 4VAC25-130-785.13 · Experimental practices mining
- 4VAC25-130-785.14 · Mountaintop removal mining
- 4VAC25-130-785.15 · Steep slope mining
- 4VAC25-130-785.16 · Permits incorporating variances from approximate original contour restoration requirements for steep slope mining
- 4VAC25-130-785.17 · Prime farmland
- 4VAC25-130-785.18 · Variances for delay in contemporaneous reclamation requirement in combined surface and underground mining activities
- 4VAC25-130-785.19 · Remining areas with pollution discharges
- 4VAC25-130-785.20 · Augering
- 4VAC25-130-785.21 · Coal preparation plants not located within the permit area of a mine
- 4VAC25-130-785.22 · In situ processing activities
- 4VAC25-130-785.25 · Lands eligible for remining
- 4VAC25-130-789.1 · Petition for award of costs and expenses under § 45.2-1025 of the Act
- 4VAC25-130-789.2 · Intervention
- 4VAC25-130-790.1 · Purpose
- 4VAC25-130-790.11 · Service of notice
- 4VAC25-130-790.12 · Contents of notice
- 4VAC25-130-795.1 · Scope and purpose
- 4VAC25-130-795.6 · Eligibility for assistance
- 4VAC25-130-795.7 · Filing for assistance
- 4VAC25-130-795.8 · Application approval and notice
- 4VAC25-130-795.9 · Program services and data requirements
- 4VAC25-130-795.10 · Qualified laboratories
- 4VAC25-130-795.11 · Assistance funding
- 4VAC25-130-795.12 · Applicant liability
- 4VAC25-130-800.11 · Requirement to file a bond
- 4VAC25-130-800.12 · Form of the performance bond
- 4VAC25-130-800.13 · Period of liability
- 4VAC25-130-800.14 · Determination of bond amount
- 4VAC25-130-800.15 · Adjustment of amount
- 4VAC25-130-800.16 · General terms and conditions of bond
- 4VAC25-130-800.17 · Bonding requirements for underground coal mines and long-term coal-related surface facilities and structures
- 4VAC25-130-800.20 · Surety bonds
- 4VAC25-130-800.21 · Collateral bonds
- 4VAC25-130-800.23 · Escrow bonding
- 4VAC25-130-800.24 · Combined surety/escrow bonding
- 4VAC25-130-800.30 · Replacement of bonds
- 4VAC25-130-800.40 · Requirements to release performance bonds