Browse Virginia regulations
Read the original sections, or search by topic.
- 4VAC25-130-800.50 · Forfeiture of bonds
- 4VAC25-130-800.51 · Administrative review of performance bond forfeiture
- 4VAC25-130-800.52 · Bond forfeiture reinstatement procedures
- 4VAC25-130-800.60 · Terms and conditions for liability insurance
- 4VAC25-130-801.2 · Scope
- 4VAC25-130-801.4 · Objective
- 4VAC25-130-801.11 · Participation in the pool bond fund
- 4VAC25-130-801.12 · Entrance fee and bond
- 4VAC25-130-801.13 · Self-bonding
- 4VAC25-130-801.14 · Reclamation tax
- 4VAC25-130-801.15 · Collection of the reclamation tax and penalties for non-payment
- 4VAC25-130-801.16 · Reinstatement to the pool bond fund
- 4VAC25-130-801.17 · Bond release application
- 4VAC25-130-801.18 · Criteria for release of bond
- 4VAC25-130-801.19 · Forfeiture
- 4VAC25-130-815.1 · Scope and purpose
- 4VAC25-130-815.2 · Permitting information
- 4VAC25-130-815.13 · Required documents
- 4VAC25-130-815.15 · Performance standards for coal exploration
- 4VAC25-130-816.11 · Signs and markers
- 4VAC25-130-816.13 · Casing and sealing of drilled holes; general requirements
- 4VAC25-130-816.14 · Casing and sealing of drilled holes; temporary
- 4VAC25-130-816.15 · Casing and sealing of drilled holes; permanent
- 4VAC25-130-816.22 · Topsoil and subsoil
- 4VAC25-130-816.41 · Hydrologic-balance protection
- 4VAC25-130-816.42 · Hydrologic balance; water quality standards and effluent limitations
- 4VAC25-130-816.43 · Diversions
- 4VAC25-130-816.45 · Hydrologic balance; sediment control measures
- 4VAC25-130-816.46 · Hydrologic balance; siltation structures
- 4VAC25-130-816.47 · Hydrologic balance; discharge structures
- 4VAC25-130-816.49 · Impoundments
- 4VAC25-130-816.56 · Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities
- 4VAC25-130-816.57 · Hydrologic balance; stream buffer zones
- 4VAC25-130-816.59 · Coal recovery
- 4VAC25-130-816.61 · Use of explosives; general requirements
- 4VAC25-130-816.62 · Use of explosives; preblasting survey
- 4VAC25-130-816.64 · Use of explosives; blasting schedule
- 4VAC25-130-816.66 · Use of explosives; blasting signs, warnings, and access control
- 4VAC25-130-816.67 · Use of explosives; control of adverse effects
- 4VAC25-130-816.68 · Use of explosives; records of blasting operations
- 4VAC25-130-816.71 · Disposal of excess spoil; general requirements
- 4VAC25-130-816.72 · Disposal of excess spoil; valley fills/head-of-hollow fills
- 4VAC25-130-816.73 · Disposal of excess spoil; durable rock fills
- 4VAC25-130-816.74 · Disposal of excess spoil; preexisting benches
- 4VAC25-130-816.75 · Disposal of excess spoil; zoned concept
- 4VAC25-130-816.76 · Disposal of excess spoil; incidental reclamation
- 4VAC25-130-816.79 · Protection of underground mining
- 4VAC25-130-816.81 · Coal mine waste; general requirements
- 4VAC25-130-816.83 · Coal mine waste; refuse piles
- 4VAC25-130-816.84 · Coal mine waste; impounding structures
- 4VAC25-130-816.87 · Coal mine waste; burning and burned waste utilization
- 4VAC25-130-816.89 · Disposal of noncoal mine wastes
- 4VAC25-130-816.95 · Stabilization of surface areas
- 4VAC25-130-816.97 · Protection of fish, wildlife, and related environmental values
- 4VAC25-130-816.99 · Slides and other damage
- 4VAC25-130-816.100 · Contemporaneous reclamation
- 4VAC25-130-816.102 · Backfilling and grading; general requirements
- 4VAC25-130-816.104 · Backfilling and grading; thin overburden
- 4VAC25-130-816.105 · Backfilling and grading; thick overburden
- 4VAC25-130-816.106 · Backfilling and grading; previously mined areas
- 4VAC25-130-816.107 · Backfilling and grading; steep slopes
- 4VAC25-130-816.111 · Revegetation; general requirements
- 4VAC25-130-816.113 · Revegetation; timing
- 4VAC25-130-816.114 · Revegetation; mulching and other soil stabilizing practices
- 4VAC25-130-816.116 · Revegetation; standards for success
- 4VAC25-130-816.131 · Cessation of operations; temporary
- 4VAC25-130-816.132 · Cessation of operations; permanent
- 4VAC25-130-816.133 · Postmining land use
- 4VAC25-130-816.150 · Roads; general
- 4VAC25-130-816.151 · Primary roads
- 4VAC25-130-816.152 · Existing roads
- 4VAC25-130-816.180 · Utility installations
- 4VAC25-130-816.181 · Support facilities
- 4VAC25-130-817.11 · Signs and markers
- 4VAC25-130-817.13 · Casing and sealing of exposed underground openings; general requirements
- 4VAC25-130-817.14 · Casing and sealing of underground openings; temporary
- 4VAC25-130-817.15 · Casing and sealing of underground openings; permanent
- 4VAC25-130-817.22 · Topsoil and subsoil
- 4VAC25-130-817.41 · Hydrologic-balance protection
- 4VAC25-130-817.42 · Hydrologic balance; water quality standards and effluent limitations
- 4VAC25-130-817.43 · Diversions
- 4VAC25-130-817.45 · Hydrologic balance; sediment control measures
- 4VAC25-130-817.46 · Hydrologic balance; siltation structures
- 4VAC25-130-817.47 · Hydrologic balance; discharge structures
- 4VAC25-130-817.49 · Impoundments
- 4VAC25-130-817.56 · Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities
- 4VAC25-130-817.57 · Hydrologic balance; stream buffer zones
- 4VAC25-130-817.59 · Coal recovery
- 4VAC25-130-817.61 · Use of explosives; general requirements
- 4VAC25-130-817.62 · Use of explosives; preblasting survey
- 4VAC25-130-817.64 · Use of explosives; general performance standards
- 4VAC25-130-817.66 · Use of explosives; blasting signs, warnings, and access control
- 4VAC25-130-817.67 · Use of explosives; control of adverse effects
- 4VAC25-130-817.68 · Use of explosives; records of blasting operations
- 4VAC25-130-817.71 · Disposal of excess spoil; general requirements
- 4VAC25-130-817.72 · Disposal of excess spoil; valley fills/head-of-hollow fills
- 4VAC25-130-817.73 · Disposal of excess spoil; durable rock fills
- 4VAC25-130-817.74 · Disposal of excess spoil; preexisting benches
- 4VAC25-130-817.75 · Disposal of excess spoil; zoned concept
- 4VAC25-130-817.76 · Disposal of excess spoil; incidental reclamation