Browse Virginia regulations
Read the original sections, or search by topic.
- 4VAC25-130-817.81 · Coal mine waste; general requirements
- 4VAC25-130-817.83 · Coal mine waste; refuse piles
- 4VAC25-130-817.84 · Coal mine waste; impounding structures
- 4VAC25-130-817.87 · Coal mine waste; burning and burned waste utilization
- 4VAC25-130-817.89 · Disposal of noncoal mine wastes
- 4VAC25-130-817.95 · Stabilization of surface areas
- 4VAC25-130-817.97 · Protection of fish, wildlife, and related environmental values
- 4VAC25-130-817.99 · Slides and other damage
- 4VAC25-130-817.100 · Contemporaneous reclamation
- 4VAC25-130-817.102 · Backfilling and grading; general requirements
- 4VAC25-130-817.106 · Backfilling and grading; previously mined areas
- 4VAC25-130-817.107 · Backfilling and grading; steep slopes
- 4VAC25-130-817.111 · Revegetation; general requirements
- 4VAC25-130-817.113 · Revegetation; timing
- 4VAC25-130-817.114 · Revegetation; mulching and other soil stabilizing practices
- 4VAC25-130-817.116 · Revegetation; standards for success
- 4VAC25-130-817.121 · Subsidence control
- 4VAC25-130-817.122 · Subsidence control; notice
- 4VAC25-130-817.131 · Cessation of operations; temporary
- 4VAC25-130-817.132 · Cessation of operations; permanent
- 4VAC25-130-817.133 · Postmining land use
- 4VAC25-130-817.150 · Roads; general
- 4VAC25-130-817.151 · Primary roads
- 4VAC25-130-817.152 · Existing roads
- 4VAC25-130-817.180 · Utility installations
- 4VAC25-130-817.181 · Support facilities
- 4VAC25-130-819.1 · Scope
- 4VAC25-130-819.11 · Auger mining; general
- 4VAC25-130-819.13 · Auger mining; coal recovery
- 4VAC25-130-819.15 · Auger mining; hydrologic balance
- 4VAC25-130-819.17 · Auger mining; subsidence protection
- 4VAC25-130-819.19 · Auger mining; backfilling and grading
- 4VAC25-130-819.21 · Auger mining; protection of underground mining
- 4VAC25-130-823.1 · Scope and purpose
- 4VAC25-130-823.4 · Responsibilities
- 4VAC25-130-823.11 · Applicability
- 4VAC25-130-823.12 · Soil removal and stockpiling
- 4VAC25-130-823.14 · Soil replacement
- 4VAC25-130-823.15 · Revegetation and restoration of soil productivity
- 4VAC25-130-824.2 · Objectives
- 4VAC25-130-824.11 · Mountaintop removal; performance standards
- 4VAC25-130-825.11 · Operational requirements
- 4VAC25-130-825.12 · Treatment of discharges
- 4VAC25-130-825.13 · Request for bond release
- 4VAC25-130-825.14 · Criteria and schedule for release of bonds on pollution abatement areas
- 4VAC25-130-827.1 · Scope
- 4VAC25-130-827.11 · General requirements
- 4VAC25-130-827.12 · Coal preparation plants; performance standards
- 4VAC25-130-828.2 · Objectives
- 4VAC25-130-828.11 · In situ processing; performance standards
- 4VAC25-130-828.12 · In situ processing; monitoring
- 4VAC25-130-840.11 · Inspections by the division
- 4VAC25-130-840.12 · Right of entry
- 4VAC25-130-840.14 · Availability of records
- 4VAC25-130-840.16 · Compliance conference
- 4VAC25-130-842.11 · Immediate inspections
- 4VAC25-130-842.12 · Citizens' requests for inspections
- 4VAC25-130-842.14 · Review of adequacy and completeness of inspections
- 4VAC25-130-842.15 · Review of decision not to inspect or enforce
- 4VAC25-130-843.11 · Cessation orders
- 4VAC25-130-843.12 · Notices of violation
- 4VAC25-130-843.13 · Suspension or revocation of permits; pattern of violations
- 4VAC25-130-843.14 · Service of notices of violation, cessation orders, and show cause orders
- 4VAC25-130-843.15 · Informal public hearing
- 4VAC25-130-843.16 · Formal review of citations
- 4VAC25-130-843.18 · Inability to comply
- 4VAC25-130-845.2 · Objective
- 4VAC25-130-845.11 · Assessment determination
- 4VAC25-130-845.12 · When a penalty will be assessed
- 4VAC25-130-845.13 · Point system
- 4VAC25-130-845.15 · Assessment of separate violations for each day
- 4VAC25-130-845.16 · Waiver of use of formula to determine civil penalty
- 4VAC25-130-845.17 · Procedures for assessment of civil penalties
- 4VAC25-130-845.18 · Procedures for assessment conference
- 4VAC25-130-845.19 · Request for hearing
- 4VAC25-130-845.20 · Final assessment and payment of penalty
- 4VAC25-130-846.12 · When an individual civil penalty may be assessed
- 4VAC25-130-846.14 · Amount of the individual civil penalty
- 4VAC25-130-846.17 · Assessment of an individual civil penalty
- 4VAC25-130-846.18 · Penalty payment
- 4VAC25-130-850.1 · Scope
- 4VAC25-130-850.5 · Definition
- 4VAC25-130-850.12 · Effective date
- 4VAC25-130-850.13 · Training
- 4VAC25-130-850.14 · Examination
- 4VAC25-130-850.15 · Certification
- 4VAC25-130-874.12 · Eligible coal lands and water
- 4VAC25-130-874.13 · Reclamation objectives and priorities
- 4VAC25-130-877.11 · Written consent for entry
- 4VAC25-130-877.13 · Entry and consent to reclaim
- 4VAC25-130-877.14 · Entry for emergency reclamation
- 4VAC25-130-879.11 · Land eligible for acquisition
- 4VAC25-130-879.12 · Procedures for acquisition
- 4VAC25-130-879.13 · Acceptance of gifts of land
- 4VAC25-130-879.14 · Management of acquired land
- 4VAC25-130-879.15 · Disposition of reclaimed land
- 4VAC25-130-882.12 · Appraisals
- 4VAC25-130-882.13 · Liens
- 4VAC25-130-882.14 · Satisfaction of liens
- 4VAC25-145-10 · Definitions