23 CFR 636.207: Is there a limit on short listed firms?
Where this section sits in the code
- Title 23—Highways
- CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
- SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS
- PART 636—DESIGN-BUILD CONTRACTING
- Subpart B—Selection Procedures, Award Criteria
Normally, three to five firms are short listed, however, the maximum number specified shall not exceed five unless you determine, for that particular solicitation, that a number greater than five is in your interest and is consistent with the purposes and objectives of two-phase design-build contracting.
Collected 2026-08-27T02:24:50Z. Source file · JSON