23 CFR 636.208: May I use my existing prequalification procedures with design-build contracts?
Where this section sits in the code
- Title 23—Highways
- CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
- SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS
- PART 636—DESIGN-BUILD CONTRACTING
- Subpart B—Selection Procedures, Award Criteria
Yes, you may use your existing prequalification procedures for either construction or engineering design firms as a supplement to the procedures in this part.
Collected 2026-08-27T02:24:50Z. Source file · JSON