GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

23 CFR 636.208: May I use my existing prequalification procedures with design-build contracts?

Read at publisher ↗
Where this section sits in the code
  1. Title 23—Highways
  2. CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
  3. SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS
  4. PART 636—DESIGN-BUILD CONTRACTING
  5. Subpart B—Selection Procedures, Award Criteria

Yes, you may use your existing prequalification procedures for either construction or engineering design firms as a supplement to the procedures in this part.

Collected 2026-08-27T02:24:50Z. Source file · JSON

Browse this collection