Browse Federal regulations
Read the original sections, or search by topic.
- 40 CFR 60.2800 · Can reporting dates be changed?
- 40 CFR 60.2805 · Am I required to apply for and obtain a Title V operating permit for my unit?
- 40 CFR 60.2810 · What is an air curtain incinerator?
- 40 CFR 60.2815 · What are my requirements for meeting increments of progress and achieving final compliance?
- 40 CFR 60.2820 · When must I complete each increment of progress?
- 40 CFR 60.2825 · What must I include in the notifications of achievement of increments of progress?
- 40 CFR 60.2830 · When must I submit the notifications of achievement of increments of progress?
- 40 CFR 60.2835 · What if I do not meet an increment of progress?
- 40 CFR 60.2840 · How do I comply with the increment of progress for submittal of a control plan?
- 40 CFR 60.2845 · How do I comply with the increment of progress for achieving final compliance?
- 40 CFR 60.2850 · What must I do if I close my air curtain incinerator and then restart it?
- 40 CFR 60.2855 · What must I do if I plan to permanently close my air curtain incinerator and not restart it?
- 40 CFR 60.2860 · What are the emission limitations for air curtain incinerators?
- 40 CFR 60.2865 · How must I monitor opacity for air curtain incinerators?
- 40 CFR 60.2870 · What are the recordkeeping and reporting requirements for air curtain incinerators?
- 40 CFR 60.2875 · What definitions must I know?
- 40 CFR Table 1 to Subpart DDDD of Part 60 · Table 1 to Subpart DDDD of Part 60—Model Rule—Increments of Progress and Compliance Schedules
- 40 CFR Table 2 to Subpart DDDD of Part 60 · Table 2 to Subpart DDDD of Part 60—Model Rule—Emission Limitations That Apply to Incinerators Before [Date To Be Specified in State Plan] 1
- 40 CFR Table 3 to Subpart DDDD of Part 60 · Table 3 to Subpart DDDD of Part 60—Model Rule—Operating Limits for Wet Scrubbers
- 40 CFR Table 4 to Subpart DDDD of Part 60 · Table 4 to Subpart DDDD of Part 60—Model Rule—Toxic Equivalency Factors
- 40 CFR Table 5 to Subpart DDDD of Part 60 · Table 5 to Subpart DDDD of Part 60—Model Rule—Summary of Reporting Requirements 1
- 40 CFR Table 6 to Subpart DDDD of Part 60 · Table 6 to Subpart DDDD of Part 60—Model Rule—Emission Limitations That Apply to Incinerators on and After [Date To Be Specified in State Plan] 1
- 40 CFR Table 7 to Subpart DDDD of Part 60 · Table 7 to Subpart DDDD of Part 60—Model Rule—Emission Limitations That Apply to Energy Recovery Units After May 20, 2011
- 40 CFR Table 8 to Subpart DDDD of Part 60 · Table 8 to Subpart DDDD of Part 60—Model Rule—Emission Limitations That Apply to Waste-Burning Kilns After May 20, 2011
- 40 CFR Table 9 to Subpart DDDD of Part 60 · Table 9 to Subpart DDDD of Part 60—Model Rule—Emission Limitations That Apply to Small, Remote Incinerators After May 20, 2011 [Date To Be Specified in State Plan] 1
- 40 CFR 60.2880 · What does this subpart do?
- 40 CFR 60.2881 · When does this subpart become effective?
- 40 CFR 60.2885 · Does this subpart apply to my incineration unit?
- 40 CFR 60.2886 · What is a new incineration unit?
- 40 CFR 60.2887 · What combustion units are excluded from this subpart?
- 40 CFR 60.2888 · Are air curtain incinerators regulated under this subpart?
- 40 CFR 60.2889 · Who implements and enforces this subpart?
- 40 CFR 60.2890 · How are these new source performance standards structured?
- 40 CFR 60.2891 · Do all components of these new source performance standards apply at the same time?
- 40 CFR 60.2894 · Who must prepare a siting analysis?
- 40 CFR 60.2895 · What is a siting analysis?
- 40 CFR 60.2899 · What is a waste management plan?
- 40 CFR 60.2900 · When must I submit my waste management plan?
- 40 CFR 60.2901 · What should I include in my waste management plan?
- 40 CFR 60.2905 · What are the operator training and qualification requirements?
- 40 CFR 60.2906 · When must the operator training course be completed?
- 40 CFR 60.2907 · How do I obtain my operator qualification?
- 40 CFR 60.2908 · How do I maintain my operator qualification?
- 40 CFR 60.2909 · How do I renew my lapsed operator qualification?
- 40 CFR 60.2910 · What site-specific documentation is required?
- 40 CFR 60.2911 · What if all the qualified operators are temporarily not accessible?
- 40 CFR 60.2915 · What emission limitations must I meet and by when?
- 40 CFR 60.2916 · What operating limits must I meet and by when?
- 40 CFR 60.2917 · What if I do not use a wet scrubber, dry scrubber, electrostatic precipitator, or fabric filter to comply with the emission limitations?
- 40 CFR 60.2918 · [Reserved]
- 40 CFR 60.2922 · How do I conduct the initial and annual performance test?
- 40 CFR 60.2923 · How are the performance test data used?
- 40 CFR 60.2927 · How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
- 40 CFR 60.2928 · By what date must I conduct the initial performance test?
- 40 CFR 60.2929 · What are the substitute means of compliance demonstration requirements for very small municipal waste combustion units and institutional waste incineration units with capacities less than or equal to 10 tons per day?
- 40 CFR 60.2932 · How do I demonstrate continuous compliance with the emission limitations and the operating limits?
- 40 CFR 60.2933 · By what date must I conduct the annual performance test?
- 40 CFR 60.2934 · May I conduct performance testing less often?
- 40 CFR 60.2935 · May I conduct a repeat performance test to establish new operating limits?
- 40 CFR 60.2939 · What continuous emission monitoring systems must I install?
- 40 CFR 60.2940 · How do I make sure my continuous emission monitoring systems are operating correctly?
- 40 CFR 60.2941 · What is my schedule for evaluating continuous emission monitoring systems?
- 40 CFR 60.2942 · What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
- 40 CFR 60.2943 · How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
- 40 CFR 60.2944 · What operating parameter monitoring equipment must I install, or what operating parameters must I monitor?
- 40 CFR 60.2945 · Is there a minimum amount of operating parameter monitoring data I must obtain?
- 40 CFR 60.2949 · What records must I keep?
- 40 CFR 60.2950 · Where and in what format must I keep my records?
- 40 CFR 60.2951 · What reports must I submit?
- 40 CFR 60.2952 · What must I submit prior to commencing construction?
- 40 CFR 60.2953 · What information must I submit prior to initial startup?
- 40 CFR 60.2954 · What information must I submit following my initial performance test?
- 40 CFR 60.2955 · When must I submit my annual report?
- 40 CFR 60.2956 · What information must I include in my annual report?
- 40 CFR 60.2957 · What other reports must I submit if I have a deviation?
- 40 CFR 60.2958 · What must I include in the deviation report?
- 40 CFR 60.2959 · What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
- 40 CFR 60.2960 · Are there any other notifications or reports that I must submit?
- 40 CFR 60.2961 · In what form can I submit my reports?
- 40 CFR 60.2962 · Can reporting dates be changed?
- 40 CFR 60.2966 · Am I required to apply for and obtain a title V permit for my unit?
- 40 CFR 60.2967 · When must I submit a title V permit application for my new unit?
- 40 CFR 60.2969 · What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery?
- 40 CFR 60.2970 · What is an air curtain incinerator?
- 40 CFR 60.2971 · What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
- 40 CFR 60.2972 · How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
- 40 CFR 60.2973 · What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
- 40 CFR 60.2974 · [Reserved]
- 40 CFR 60.2975 · What equations must I use?
- 40 CFR 60.2977 · What definitions must I know?
- 40 CFR Table 1 to Subpart EEEE of Part 60 · Table 1 to Subpart EEEE of Part 60—Emission Limitations for OSWI Units That Commenced Construction on or Before August 31, 2020
- 40 CFR Table 1a to Subpart EEEE of Part 60 · Table 1a to Subpart EEEE of Part 60—Emission Limitations for OSWI Units With Capacities Greater Than 10 Tons per Day That Commenced Construction After August 31, 2020 or Commenced Reconstruction or Modification on or After December 29, 2025
- 40 CFR Table 1b to Subpart EEEE of Part 60 · Table 1b to Subpart EEEE of Part 60—Emission Limitations for OSWI Units With Capacities Less Than or Equal to 10 Tons per Day With That Commenced Construction After August 31, 2020 or Commenced Reconstruction or Modification on or After December 29, 2025
- 40 CFR Table 2 to Subpart EEEE of Part 60 · Table 2 to Subpart EEEE of Part 60—Operating Limits for Incinerators
- 40 CFR Table 3 to Subpart EEEE of Part 60 · Table 3 to Subpart EEEE of Part 60—Requirements for Continuous Emission Monitoring Systems (CEMS)
- 40 CFR Table 4 to Subpart EEEE of Part 60 · Table 4 to Subpart EEEE of Part 60—Summary of Reporting Requirements
- 40 CFR 60.2980 · What is the purpose of this subpart?
- 40 CFR 60.2981 · Am I affected by this subpart?
- 40 CFR 60.2982 · Is a state plan required for all States?
- 40 CFR 60.2983 · What must I include in my State plan?